You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap di PHB Dermaga Rampung

Channel Retaining Wall Repair on Jl. Palem Raya Kembangan is Completed

West Jakarta Water Resources (SDA) Sub-agency has completed repair work on connecting (PHB) channel's retaining wall on Jl. Palem Raya, Joglo Urban Village, Kembangan, West Jakarta. With this repair, it is hoped the channel can be optimal in holding water discharge.

We deploy 25 West Jakarta SDA Sub-agency Unit personnel to repair it

West Jakarta SDA Sub-agency's Drainage Maintenance Section Head, Wawan Kurniawan stated, previously channel's retaining wall was collapsed due to strong water flow. His side repair the collapsed retaining walls as long as 30 meters with height of 2 meters.

"We deploy 25 West Jakarta SDA Sub-agency Unit personnel to repair it. The work is now finished, thus we hope water can flow smoothly," he said, Thursday (4/15).

Collapsed Retaining Wall at Pondok Ranggon Public Cemetery Has Been Repaired

Repair on retaining wall which attached to dividing wall of Joglo Public Cemetery (TPU) was started from March 30 to April 14, 2021.

"We repair it by cleaning debris from the channel and patching it using river stones, cement, and sand," he explained.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye868 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye355 personAldi Geri Lumban Tobing
close