You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap di PHB Dermaga Rampung

Channel Retaining Wall Repair on Jl. Palem Raya Kembangan is Completed

West Jakarta Water Resources (SDA) Sub-agency has completed repair work on connecting (PHB) channel's retaining wall on Jl. Palem Raya, Joglo Urban Village, Kembangan, West Jakarta. With this repair, it is hoped the channel can be optimal in holding water discharge.

We deploy 25 West Jakarta SDA Sub-agency Unit personnel to repair it

West Jakarta SDA Sub-agency's Drainage Maintenance Section Head, Wawan Kurniawan stated, previously channel's retaining wall was collapsed due to strong water flow. His side repair the collapsed retaining walls as long as 30 meters with height of 2 meters.

"We deploy 25 West Jakarta SDA Sub-agency Unit personnel to repair it. The work is now finished, thus we hope water can flow smoothly," he said, Thursday (4/15).

Collapsed Retaining Wall at Pondok Ranggon Public Cemetery Has Been Repaired

Repair on retaining wall which attached to dividing wall of Joglo Public Cemetery (TPU) was started from March 30 to April 14, 2021.

"We repair it by cleaning debris from the channel and patching it using river stones, cement, and sand," he explained.

Linked News
Popular News indeks
  1. Jakarta Removes Gibran’s Portraits Across All Government Offices

    access_time16-11-2026 remove_red_eye956 personFakhrizal Fakhri
  2. Transjakarta Offers Free Rides for Jakarta Vertical Run 2026 Participants

    access_time14-11-2026 remove_red_eye632 personAldi Geri Lumban Tobing
  3. Governor Approves Removal of Seven Unauthorized Houses on Dispora Land

    access_time13-11-2026 remove_red_eye609 personFakhrizal Fakhri
  4. Pramono Outlines Measures to Address Five Issues in Kramat Jati

    access_time13-11-2026 remove_red_eye597 personFakhrizal Fakhri
  5. Jakarta Esports 2026 Draws Enthusiastic Crowds at M Bloc Space

    access_time13-11-2026 remove_red_eye563 personTiyo Surya Sakti